Official Council Document
LIM Report
Quick Answer
A LIM Report for an Alexandra property is the official record Central Otago District Council holds about that address — building consents, zoning, rates, drainage and any hazards affecting the land. Order the report and we obtain the full record and deliver it to you.
Every property in Alexandra has a file held on the official council file. It records what has been consented, what the council knows about the land, and what conditions attach to it. A Land Information Memorandum is how that file is released. In a market built on township housing, orchard blocks and lifestyle properties, what sits in that file is often the difference between a sound purchase and an expensive discovery after settlement.
Official Council Document
LIM Report
Location
Alexandra
Online Delivery
Delivered online via email
A Land Information Memorandum is a formal statement issued under section 44A of the Local Government Official Information and Meetings Act 1987. For an Alexandra property the records are those held on the official council file. The report draws together what the authority holds on its property file: consent records, rating information, drainage and services data, district plan zoning, and any hazard information it is aware of. It is a disclosure at a point in time — not an inspection, and not a valuation.
They answer different questions and most buyers need both.
| Situation | Recommended Document |
|---|---|
| What the council knows. | LIM |
| Who owns the land and what legal interests are registered against it — easements, covenants, mortgages, cross-lease or unit title structures. | Record of title |
| If you are assessing physical condition | Building inspection |
to commission; a LIM records what was consented, not whether the work was done well or has since deteriorated.
An Alexandra LIM typically covers
building consents, permits and code compliance certificates held on the property file
the district plan zoning and any overlays or designations affecting the site
rates information and any outstanding amounts
stormwater, wastewater and water supply connections, including drainage plans where held
hazards known to the council — for Alexandra commonly river flooding, alluvial fan hazards, slope instability and extreme temperature range
and any requisitions, notices or orders issued against the property
Buyers in Alexandra order a LIM to find out what has been consented before they commit.
Unconsented work is the most common discovery, and it transfers to the new owner along with the obligation to resolve it.
Lenders and insurers increasingly ask about hazard exposure before confirming terms, and since the natural hazard provisions came into force in October 2025 councils record that information more fully than they once did.
A buyer in Alexandra finds a deck and a carport on the property file with no code compliance certificate, and the vendor is asked to close out the consent before settlement.
A purchaser discovers the site sits in an area affected by river flooding, which changes both the insurance quote and the lending conversation.
An owner planning a subdivision checks the zoning and services position before committing to survey costs.
It maintains the property file, processes building and resource consents, and issues the LIM. A horticultural and lifestyle market with growing residential demand. That local context shapes what appears on an Alexandra LIM: river flooding, alluvial fan hazards, slope instability and extreme temperature range are the hazard categories most likely to be recorded, and the district's housing stock — township housing, orchard blocks and lifestyle properties — determines the kind of consent history you should expect to see. An Alexandra LIM reflects that district's records specifically; it does not carry information held for any other district.
Assuming a LIM covers physical condition — it records what's on the official file, not what a builder would find.
Assuming that because a structure exists it was consented.
Relying on a LIM the vendor obtained months earlier, when council records have since changed.
Leaving the order until the final days of a due diligence period.
reading a clear LIM as a guarantee, when it confirms only that the council holds no record of a problem.
A LIM is not enough on its own. It will not tell you who owns the property or what is registered against the title — that requires a record of title. It will not identify defects, weathertightness issues or structural problems; that is a building inspection. It does not value the property. For a full picture of an Alexandra property, a LIM sits alongside a title search and an independent building report.
Provide the Alexandra property address and confirm whether you need the residential or commercial report. Complete the order and we take care of the rest — we obtain the full official record for the property and deliver your completed LIM Report electronically as soon as it is ready.
Standard delivery for an Alexandra LIM Report is within 15 working days of order confirmation. If your deadline is closer than that, Fast Track Processing (NZ$299) puts your order at the front of the queue with delivery targeted inside 10 working days. Allow extra margin for complex property files, and if settlement or auction dates are fixed, Fast Track is the safer choice.
It can. Insurers increasingly price flood exposure directly, and a notation on the official record is the kind of information an underwriter will ask about. Obtain the LIM before your finance and insurance conditions expire, so a revised premium is something you can act on rather than absorb.
An alluvial fan is a debris and floodwater pathway from a hillside or gully, and the council maps them because they concentrate risk on otherwise unremarkable-looking flat land. A fan notation can carry building restrictions and materially affects insurance.
Services and consents. official records what is connected and what is on-site — water supply, wastewater, stormwater — plus consents for any dwellings, sheds and implement buildings. Unconsented farm structures are common and become the new owner's responsibility.
Yes. A LIM can be requested by anyone for any property — you do not need to own it or have the owner's permission. That is precisely what makes it usable for pre-purchase due diligence.
Yes. They answer different questions. The LIM shows what the council consented; an inspection shows the physical condition of what was built. A well-constructed unconsented extension passes an inspection and still becomes your problem.
The obligation to resolve it passes to you on settlement. The council can require regularisation or removal, regularisation is not always achievable, and unconsented work affects insurance and future resale. While your offer is still conditional you have options; afterwards you do not.
Enter the Alexandra address and we will obtain the full Central Otago District Council record for the property. Residential NZ$1,299. Commercial NZ$2,499. Fast Track Processing NZ$299.
Get Your LIM Report - AlexandraProperty Records Team
Last updated: